Construction Updates

To sign up for email notifications of these weekly updates, click Notify Me and select “Construction Updates.”

If you have any questions throughout construction season, please email Engineering@coonrapidsmn.gov or call 763-767-6479. 

Street Reconstruction Project 19-1 – 4 miles of residential streets

The Contractor for this project is North Valley, Inc. The Contractor's main contact is Herb Thielbar, who can be reached at 763-274-2580 (office) or 612-716-4214 (cell). Zach Pfieffer is the City’s full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Zach can be reached at 763-767-6431 (office) or 612-710-8243 (cell).

Work during the week of August 12 will include final wear course paving within Area 2 (Partridge Street, Raven Street, 123rd Lane, and 124th Avenue), expected to occur on Tuesday and/or Wednesday. Concrete curb installations will take place on remaining areas within the south half of Area 3 (streets south of and including 131st Avenue). Hydrant and valve replacements and curb removals are now expected to begin on local streets in Area 3 north of 131st Avenue next week. 

Street Reconstruction Project 19-2 – 2.3 miles of MSA streets (Foley Boulevard from 115th Avenue to 124th Avenue, Wedgewood Drive from Main Street to Round Lake Boulevard, Olive Street from 121st Avenue to Main Street) 

The Contractor for this project is Park Construction. The Contractor's main contact is Dan Bodza, who can be reached at 612-248-7760 (cell). Rene Garcia (612-360-4707) with Park Construction is the Contractor point of contact for watermain pipe replacements. Jon Halter with Hakanson Anderson is the City’s full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Jon can be reached at 612-282-0725 (cell).

Work planned for the week of August 12 includes paving asphalt base course pavement from 121st Avenue to 122nd Avenue. Concrete curb is expected on Olive Street from 123rd Avenue to Main Street as well. Boulevard restorations on Olive Street will commence following curb and asphalt operations. Remaining areas on the west side of Foley Boulevard will be paved early next week, and restoration operations will take place immediately following pavement installation.

Looking ahead, work on Wedgewood Boulevard is planned to begin the week of August 19, as well as construction on the east side of Foley Boulevard. Replacement of the Sand Creek culverts is tentatively planned to occur during the month of September. This culvert work will require the closure of Foley Boulevard at the Sand Creek crossing which is located south of 118th Avenue. As the schedule for this work is finalized, more information will be mailed to area residents regarding access and detour plans. 

Street Reconstruction Project 19-3 – 3.3 miles of residential streets 

The Contractor for this project is Douglas-Kerr Underground, Inc. The Contractor's main contact is Ryan Kerr, who can be reached at 320-679-8937 (office) or 320-515-0046 (cell). Jason Huebscher is the City’s full-time project inspector, and can be contacted any time to respond to specific questions or concerns. Jason can be reached at 763-767-6570 (office) or 612-709-2704 (cell).

Work during the week of August 12 will include completion of gravel base and installation of concrete curb in the Phase 1B area where watermain pipe replacements took place (Bridgewater neighborhood consisting of Alder Street, Butternut Street, Cottonwood Street, 116th Avenue, 116th Lane, and 117th Avenue).

Concrete curb and irrigation repairs are planned for the southbound segment of Springbrook Drive.

Work on the new watermain system on Mississippi Boulevard between Hanson Boulevard and Ibis Street will begin.

On Flora Street north of 109th Lane (adjacent to the Coon Rapids Ice Center), curb removal work and installation of the new watermain system is planned.

Trail Reconstruction Project 19-9 – Erlandson Park Pedestrian Bridge & Dahlia Park Culvert Installation 

The Contractor for this project is Blackstone Contractors. The Contractor's main contact is Brooks Duesterhoeft, who can be reached at 763-291-7728 (office) or 763-267-9411 (cell). Hafedh Hlel is the City’s project engineer/inspector, and can be contacted any time to respond to specific questions or concerns. Hafedh can be reached at 763-767-6412 (office) or 763-339-6128 (cell).

Work during the week of August 12 includes the placement of the new pedestrian bridge in Erlandson Park near 111th Avenue and Avocet Street (tentatively planned for Thursday). Trail access remains closed in this area.

Trail and culvert work within Dahlia Park is planned to begin the week of August 19.

Trail Reconstruction Project 19-11 – Wedgewood Trail, Nelson Park Trails, and Trackside Park Trails 

The Contractor for this project is Northwest Asphalt. The Contractor's main contact is John Hamers, who can be reached at 952-445-1003 (office) or 952-292-8471 (cell). Hafedh Hlel is the City’s project engineer/inspector, and can be contacted any time to respond to specific questions or concerns. Hafedh can be reached at 763-767-6412 (office) or 763-339-6128 (cell).

This project is substantially complete.

Port Riverwalk Development Project 19-12 – Grading, Erosion Control, and Turf Establishment 

The Contractor for this project is North Pine Aggregate. The Contractor's main contact is Jake Jensen, who can be reached at 651-888-7907 (office) or 612-770-6682 (cell). Ron Sample is the City’s project inspector, and can be contacted any time to respond to specific questions or concerns. Ron can be reached at 763-767-6427 (office) or 763-257-3874 (cell).

Work during the week of August 12 includes initial topsoil stripping and installation of erosion control devices (silt fence). 

Anoka County Project – Hanson Boulevard (CSAH 78) Railroad Bridge Overpass

Hanson Boulevard is a County road in Coon Rapids (north of Coon Rapids Boulevard). The County’s Contractor for this project is C.S McCrossan. Harry Grams is the County’s Construction Supervisor, and can be contacted at 763-324-3114.

To view the County’s updates and subscribe to email notifications, click here: http://www.anokacounty.us/1578/Construction-Weekly  

Watch our Videos!   

Watch the City’s street reconstruction videos to learn more about the process! The first addresses frequently asked questions, and the second demonstrates what the process will look like in a Coon Rapids neighborhood.

View them here: www.coonrapidsmn.gov/843/Street-Reconstruction